High Quality Safe and Healthy Glass Bottle Pure Mineral Water Filling Machine Automatic 3 in 1 Hot Sale
Zhangjiagang City Nancheng Machinery Co., Ltd.
Jiangsu, China
Last Login Date:
Nov 22, 2023
Main Products:
Filling Machine, Juice Filling Machine, Carbonated Drink Filling Machine, Water Filling Machine, Packing Machine, Water Treatment System, Beer Filling Machine, Can Filling Machine, Bottle Blowing Machine, Oil Filling Machine
Product Description
Company Info
Basic Info.
Product Description
Product FeaturesThis machine incorporates washing,filling and capping into one and is a kind of full-automatic equipment.It is widely used for alcohol,grape wine,soy sauce,vinegar and so on.The machine adopts plain cam structure and vacuum air-breathing principle,makes filling easy and stable.The machine structure is simple and performance is reliable,it is widely used for many types of bottles.Meanwhile,it has precise filling level,no bottle break and leakage,easy operate and maintain.
3)304/316 Stainless steel Gripper with plastic pad, ensure minimal bottle crash during washing
4)304/316 stainless steel washing pump make the machine more durable .
3)All 304/316 stainless steel contact parts & liquid tank, fine polish, no death corner, easy to clean
4) 304/316 stainless steel filling pump
5)Efficient spray nozzle rinse thoroughly and save water for flushing
6)Air lifting mechanism makes the running more stable and smooth.
3)No bottle no capping
4)Automatic stop when lack of bottle
5)Capping effect is stable and reliable ,Defective rate ≤0.2% .
Model(BCGF) | 14-12-5 | 18-18-6 | 24-24-6 | 32-32-8 | 40-40-12 | 50-50-12 |
Washing heads | 14 | 18 | 24 | 32 | 40 | 50 |
Filling heads | 12 | 18 | 24 | 32 | 40 | 50 |
Capping heads | 5 | 6 | 6 | 8 | 12 | 12 |
Capacity(BPH) | 2000 | 3500 | 5000 | 8000 | 12000 | 16000 |
Power(kw) | 2.2 | 3.5 | 4.5 | 6 | 7.5 | 9.5 |
Dimension(mm) | 2400*1600*2500 | 2600*1920*2550 | 3100*2300*2800 | 3800*2500*2900 | 4600*2800*2900 | 5450*3300*2900 |
Weight(kg) | 2500 | 3500 | 4500 | 5600 | 8500 | 9800 |
Zhangjiagang Nancheng Machine Co.,Ltd
2 / The equipment will be tested and run for 24 hours before leaving the factory, to ensure the smooth working of water pipeline,and pneumatic, electrical and mechnical stability.
3 / Sufficient stock of spare parts ensures the timely delivery and supply of spare parts.
1.HOW TO FIND MACHINERY?
1/Search made in china ,Google,Youtube,Facebook and find suppliers and manufacturer,not traders
2/Visit exhibition in different countries
3/Send Nancheng Machinery an request and tell your basic inquiry
4/Nancheng Machinery sales manager will reply you in short time and add instant chatting tool
2.YOU ARE WELCOME TO OUR FACTORY AT ANY TIME.
1/If we can full-fill your request and you interested in our products,you may pay a visit to Nancheng Machinery site
2/The meaning of visiting supplier,because seeing is believing,Nancheng Machinery with our own manufacture and developed&research team,we can send you engineers and make sure your after sales service.
3.HOW TO GUARANTEE YOUR FUNDS TO BE SAFE AND DELIVERY TO BE ON TIME?
1/Through letter guarantee service,it will ensure the on time delivery and the quality of the equipment you want to buy.
2/By letter of credit,you can lock the delivery time easily.
3/After the factory visit,You can ensure the facticity of our bank account.
4.SEE Nancheng MACHINERY HOW TO ENSURE THE QUALITY!
1/In order to ensure the accuracy of each part,we are equipped with a variety of professional processing equipment and we have accumulated professional processing methods over the past years.
2/Each component before assembly needs strictly control by inspecting personnel.
3/Each assembly is in charged by a master who has working experience for more than 5 years
4/After all the equipment are completed,we will connect all the machines and run the full production line for at least 12 hours to ensure the stable running in customers' factory
5.THE AFTER-SALE SERVICE OF Nancheng MACHINERY!
1/After finish the production,we will debug the production line,take photos,videos and send them to customers via mail or instant tools
2/After the commissioning,we will package the equipment by standard export package for shipment.
3/According to the customer's request,we can arrange our engineers to customers' factory to do the installation and training.
4/Engineers,sales managers and after-sales service manager will form a after-sales team,online and off line,to follow the
customers' project.